Technical Specification

up to 50% discount

Big Sale

Shop now

WALL HUNG BASIN

As per shown in the picture, the rag bolt must be grouted into the cement/concrete wall. The bolts must be fixed to the cement/concrete wall.
Allow setting & checking it using nuts and washer.

MATERIAL & TOOLS

Measure tape, Keyhole or saber saw, Hammer, Glasses, Rags or

paper toweling, Drill (1/2 dia, drill bit or larger) Pencil, Sealant, Sharp knife or scissors.

FOR WOOD COUNTER TOPS:

  1. Mark and per-drill the wood screw holes at the locations shown on the template.
  2. Waterproof any exposed areas of wood.

FOR MARBLE COUNTER TOPS:

  1. Position the counter top upside on foam padding fo protect the surface. Mark and drill 3/6″ holes 5/8′ deep the locations shown on template
  2. use a setting tool and hammer t0 secure the anchors.

COUNTER WASHBASIN

At the beginning

  1. A skilled or experienced person Should install Counter lavatories.
  2. Avoid using adhesive with this product.
  3. Check the waste area and Supply tubing if required.
  4. Do not open the lavatory from its protective Carton until you are ready for installation.
  5. Please follow all local building and plumbing codes.

INSTALLATION OF LAVATORY

Please Note: Please install it in a way that future removal from underneath the counter top is possible Without damaging the counter top.

  1. Please check the desired location clearance the back splash, faucet, Fixture, and cabinet.
  2. Please Cut the template.
  3. Please carefully trace the template on the counter top directed.
  4. Please the faucet hole centerline on the Counter top.
  5. Please drill a 1/2′ pilot on the inside of the cut line.

FOR ALL INSTALLATIONS:

  1. if the counter top has not been installed, install it at this time.
  2. Drill the faucet holes according to the faucet installation instruction.
  3. Install the faucet to counter top according to the manufacture’s instructions.
  4. Install the drain to the lavatory according to the manufacturer’s instructions
X